Foundation work for a new structure at the Production Site was well under way, Ship 32’s scrapped aft stiffened barrel was spotted, and concrete was being torn up at the Remedios Avenue storage area – presumably in preparation for new construction there. ⚡ Become a member of NASASpaceflight’s channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡ 🎥 Video from Jack (@theJackBeyer), Nic (@NicAnsuini), and Starbase Live. ✂️ Edited by Thomas (@_thomashayden). 🔍 All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. L2 Boca Chica (more clips and photos) from BC’s very early days to today. 🔗 https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) #starbase #spacex #starship #superheavy #bocachica Timestamps: 0:00 – Work at the Remedios Storage Site 1:04 – Storage Area Off Remedios Ave 1:57 – The Rocket Garden 3:11 – Drilling Pilings for a New Building 3:59 – Back of the Mega Bay 4:51 – The Mid Bay 5:12 – The Ring Yard 5:31 – S32 Aft Barrel Section (Scrapped) 5:59 – Boca Chica Beach 6:37 – Sunset at Starbase
Read More…
Pilings Drilled for New Building (Another Mega Bay?) | SpaceX Boca Chica